Account Contact
Je winkelwagen
Verzending via DPD & FedEx
Hulp nodig? Vraag het de AI

Boker Magnum Long Lead EDC mes 01SC080 - 440A drop-point lemmet, G-10 greep, linerlock

Boker Magnum Long Lead EDC mes 01SC080 - 440A drop-point lemmet, G-10 greep, linerlock
Boker Magnum Long Lead EDC mes 01SC080 - 440A drop-point lemmet, G-10 greep, linerlock
37,34 €
The Boker Magnum Long Lead EDC Knife stands out from typical everyday carry blades with its slim, elongated profile and dual opening options, making it a versatile companion for daily tasks. Built around a reliable 440A stainless steel drop point blade, this knife delivers consistent cutting perform... Lees meer
Voorraad 9 Code 3318994 Merk BOKER MAGNUM Model 01SC080 Garantie 2 jaar

Bezorging & retourneren

Verwachte bezorgdatum maandag, oktober 19
Je blijft op de hoogte via ons uitgebreide trackingsysteem
Betaalopties
BetaalkaartVisaMastercardPayPalApple PayGoogle PayBankoverschrijving

The Boker Magnum Long Lead EDC Knife stands out from typical everyday carry blades with its slim, elongated profile and dual opening options, making it a versatile companion for daily tasks. Built around a reliable 440A stainless steel drop point blade, this knife delivers consistent cutting performance while remaining easy to maintain. The black G-10 handle offers a secure, textured grip in all conditions, and the linerlock mechanism ensures safe, solid blade lockup during use. Whether you prefer the quick action of the flipper or the deliberate control of the thumb stud, the Long Lead adapts to your style. With a satin-finished plain edge and a convenient tip-up pocket clip, this knife is ready for everything from opening packages to light outdoor chores.

Highlights

  • 440A stainless steel drop point blade with satin finish and plain edge
  • Dual opening: flipper and thumb stud for fast or controlled deployment
  • Secure linerlock mechanism prevents accidental closure
  • Durable black G-10 handle with textured grip and lanyard hole
  • Tip-up right-hand pocket clip for easy carry
  • Compact yet capable: 88 mm blade, 205 mm overall length

In daily use

The Long Lead EDC Knife excels in everyday scenarios where a reliable, easy-to-access blade is essential. The flipper allows one-handed opening with a quick flick, while the thumb stud offers a more measured approach for precise tasks. The 2.8 mm thick blade provides a good balance between strength and slicing ability, making it suitable for cutting cardboard, rope, or food preparation. The G-10 handle is lightweight yet tough, resisting moisture and wear, and the lanyard hole lets you attach a cord for extra security. The non-reversible clip keeps the knife discreetly in your pocket, ready for action.

Full specifications

  • Brand: Boker Magnum
  • Model: Long Lead EDC Knife
  • MPN: 01SC080
  • EAN: 4045011226663
  • Blade material: 440A stainless steel
  • Handle material: G-10
  • Locking mechanism: Linerlock
  • Opening mechanism: Flipper, thumb stud
  • Blade type: Drop point
  • Blade finish: Satin
  • Edge type: Plain edge
  • Overall length (open): 205 mm
  • Blade length: 88 mm
  • Handle length: 117 mm
  • Blade thickness: 2.8 mm
  • Weight: 125 g
  • Pocket clip: Tip-up, right-hand (non-reversible)
  • Lanyard hole: Yes
  • Handle colour: Black
  • Designer: Boker Magnum
  • Country of origin: China
  • Intended use: Everyday Carry (EDC)

Final note

With its practical design and dependable materials, the Boker Magnum Long Lead EDC Knife is a smart choice for anyone seeking a no-nonsense everyday blade that performs when it counts.

Specificaties
Aantal bladen
1
Aantal per verpakking
1 piece
Bladkleur
Satin
Categorie
Knives
Dikte
2.8 mm
EAN
4045011226663
Gesegmenteerd lemmet
No
Gewicht
0.07 kg
Intrekbaar mes
No
Lengte
205 mm
Materiaal handgreep
G-10
Merk
Boker Magnum
Model
Long Lead EDC Knife
MPN
01SC080
Productkleur
Black
Prijsverloop van de afgelopen 6 maanden
Boker Magnum Long Lead EDC mes 01SC080 - 440A drop-point lemmet, G-10 greep, linerlock
Actueel
37,34 €
Laagste
36,79 €
Hoogste
37,72 €
Wijziging 24 uur
+0,51 €   +1%
Week
+0,03 €   +0%
Maand
-0,38 €   -1%

Populaire producten in deze categorie

Hoi, ik ben de AI-assistent van DistriNode. Ik help je graag met het vinden van producten, het vergelijken van opties, het maken van offerte-PDF's of het openen van supportaanvragen.